{"id":1151,"date":"2022-09-21T10:34:08","date_gmt":"2022-09-21T08:34:08","guid":{"rendered":"https:\/\/ikwilcirculairinkopen.nl\/en\/cases\/de-cruquiusbrug-ook-complexe-projecten-kunnen-circulair-zijn\/"},"modified":"2023-09-20T11:36:24","modified_gmt":"2023-09-20T09:36:24","slug":"cruquiusbrug-complex-projects-also-have-the-capacity-to-be-circular","status":"publish","type":"post","link":"https:\/\/ikwilcirculairinkopen.nl\/en\/cruquiusbrug-complex-projects-also-have-the-capacity-to-be-circular\/","title":{"rendered":"Cruquiusbrug \u2013 complex projects also have the capacity to be circular"},"content":{"rendered":"\n<p>The two sections of the Cruquius Bridge were ready for a facelift. The province of North Holland focused on three pillars: circularity, energy neutrality and low maintenance.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"493\" src=\"https:\/\/ikwilcirculairinkopen.nl\/app\/uploads\/sites\/2\/2022\/09\/Cruquius-bridge-1024x493.png\" alt=\"\" class=\"wp-image-1551\" srcset=\"https:\/\/ikwilcirculairinkopen.nl\/app\/uploads\/sites\/2\/2022\/09\/Cruquius-bridge-1024x493.png 1024w, https:\/\/ikwilcirculairinkopen.nl\/app\/uploads\/sites\/2\/2022\/09\/Cruquius-bridge-300x144.png 300w, https:\/\/ikwilcirculairinkopen.nl\/app\/uploads\/sites\/2\/2022\/09\/Cruquius-bridge-768x370.png 768w, https:\/\/ikwilcirculairinkopen.nl\/app\/uploads\/sites\/2\/2022\/09\/Cruquius-bridge.png 1215w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Project implementation<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Client: Province of North Holland<\/li>\n\n\n\n<li>Project: replacement and maintenance of moving traffic bridge<\/li>\n\n\n\n<li>Tendering: competitive dialogue<\/li>\n\n\n\n<li>Award: January 2021<\/li>\n<\/ul>\n\n\n\n<p>Cruquiusbrug is an important link between Hoofddorp and Heemstede. The bridge had become somewhat outdated. Of the two sections of the bridge, only one needed to be replaced, while the other needed major maintenance work.<\/p>\n\n\n\n<p>It was not just any old project \u2013 the combination of heavy traffic pressure, technical complexity and the nearby historical Cruquius pumping station made it a considerable challenge.&nbsp;<\/p>\n\n\n\n<p>Plus, the province of North Holland was also asking the market to fulfil its sustainable ambitions. As an example, the province wanted as little maintenance for as long a period of time as possible.&nbsp;<\/p>\n\n\n\n<p>The province organised a competitive dialogue for the Cruquiusbrug. And with success, producing a combination of enthusiastic market parties. Together, they worked as part of a construction team on both design and execution of the project.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Impact of the project<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Potential ECI reduction of 64 per cent compared to a reference design<\/li>\n\n\n\n<li>Maintenance costs reduced from 5.7 to 3.1 million Euros<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">These three factors made this project a success<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Internal support for ambitions<\/strong> <br>The Province realised this support by organising sessions with stakeholders in the organisation. Board and management involvement also contributed to support.<\/li>\n\n\n\n<li><strong>Intensive dialogue with market parties<\/strong> <br>Scheduling both individual and plenary sessions gave market parties the opportunity to question and discuss the ambitions. The talks also provided ample room in which to discuss ways to realise those ambitions.<\/li>\n\n\n\n<li><strong>Award based on quality<\/strong> <br>The Province opted to award the contract based entirely on quality. A significant step, but one that really gave market parties space in which to differentiate themselves. The Province set a task budget for design and realisation.&nbsp;<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Tips for a similar project<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Take the time to determine your ambitions.<\/strong> <br>It is a good idea to set your ambitions early on.\nWhat do you want to put out to tender and what not?\nFor each topic \u2013 think \u2018circular\u2019 or \u2018energy\u2019 \u2013 make clear what your aims are.\nThis will give market parties a clear direction.&nbsp;<\/li>\n<\/ol>\n\n\n\n<ol class=\"wp-block-list\" start=\"2\">\n<li><strong>Be open and flexible.<\/strong> <br>Ask market parties to indicate those requirements that could impede ambitions. In so doing, be open and flexible, but clear on what cannot be done. That way, you create support in addition to clarity. After all, you have to work together!<\/li>\n<\/ol>\n\n\n\n<ol class=\"wp-block-list\" start=\"3\">\n<li><strong>Opt for focus in the assessment.<\/strong> <br>The Province chose to award entirely based on quality, precisely because of the high ambitions and technical complexity. If you choose to do this, it is important to bring focus to your quality criteria. This helps you to assess tender submissions objectively.&nbsp;<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">Want to know more about this project?<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/www.pianoo.nl\/nl\/themas\/maatschappelijk-verantwoord-inkopen\/beleid-en-uitvoering\/koopwijsprijs\" target=\"_blank\" rel=\"noreferrer noopener\">Video:\nInterview with project manager Tino van der Giesen and purchasing advisor Jacqueline Roosendaal&nbsp;<\/a>&nbsp;<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"\/\/www.cruquiusbrug.nl\/\u201d\" target=\"\u201d_blank\u201d\" rel=\"\u201dnoreferrer noopener\">Website: website with current information and in-depth publications relating to the Cruquiusbrug<\/a>&nbsp;<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Want to make a start yourself?&nbsp;<\/h2>\n\n\n\n<p>Identify your next step with our step-by-step plan for circular procurement.&nbsp;<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button \u201dwp-block-button\u201d\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/\/ikwilcirculairinkopen.nl\/stappenplan\/\u201d\">See the step-by-step plan<\/a><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The two sections of the Cruquius Bridge were ready for a facelift. The province of North Holland focused on three pillars: circularity, energy neutrality and low maintenance. Project implementation Cruquiusbrug is an important link between Hoofddorp and Heemstede. The bridge had become somewhat outdated. Of the two sections of the bridge, only one needed to [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":1551,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[12],"tags":[],"class_list":["post-1151","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-infrastructure"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Circular Procurement Platform<\/title>\n<meta name=\"description\" content=\"The two sections of the Cruquius Bridge are due for a facelift. The province of North Holland is focused on three pillars: circularity, energy neutrality and low maintenance.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ikwilcirculairinkopen.nl\/en\/cases\/cruquiusbrug-complex-projects-also-have-the-capacity-to-be-circular\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:description\" content=\"The two sections of the Cruquius Bridge are due for a facelift. The province of North Holland is focused on three pillars: circularity, energy neutrality and low maintenance.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ikwilcirculairinkopen.nl\/en\/cases\/cruquiusbrug-complex-projects-also-have-the-capacity-to-be-circular\/\" \/>\n<meta property=\"og:site_name\" content=\"Circular Procurement Platform\" \/>\n<meta property=\"article:modified_time\" content=\"2023-09-20T09:36:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ikwilcirculairinkopen.nl\/app\/uploads\/sites\/2\/2022\/09\/Cruquius-bridge.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1215\" \/>\n\t<meta property=\"og:image:height\" content=\"585\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/ikwilcirculairinkopen.nl\/en\/cases\/cruquiusbrug-complex-projects-also-have-the-capacity-to-be-circular\/\",\"url\":\"https:\/\/ikwilcirculairinkopen.nl\/en\/cases\/cruquiusbrug-complex-projects-also-have-the-capacity-to-be-circular\/\",\"name\":\"\",\"isPartOf\":{\"@id\":\"https:\/\/ikwilcirculairinkopen.nl\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/ikwilcirculairinkopen.nl\/en\/cases\/cruquiusbrug-complex-projects-also-have-the-capacity-to-be-circular\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/ikwilcirculairinkopen.nl\/en\/cases\/cruquiusbrug-complex-projects-also-have-the-capacity-to-be-circular\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/ikwilcirculairinkopen.nl\/app\/uploads\/sites\/2\/2022\/09\/Cruquius-bridge.png\",\"datePublished\":\"2022-09-21T08:34:08+00:00\",\"dateModified\":\"2023-09-20T09:36:24+00:00\",\"description\":\"The two sections of the Cruquius Bridge are due for a facelift. The province of North Holland is focused on three pillars: circularity, energy neutrality and low maintenance.\",\"breadcrumb\":{\"@id\":\"https:\/\/ikwilcirculairinkopen.nl\/en\/cases\/cruquiusbrug-complex-projects-also-have-the-capacity-to-be-circular\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/ikwilcirculairinkopen.nl\/en\/cases\/cruquiusbrug-complex-projects-also-have-the-capacity-to-be-circular\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/ikwilcirculairinkopen.nl\/en\/cases\/cruquiusbrug-complex-projects-also-have-the-capacity-to-be-circular\/#primaryimage\",\"url\":\"https:\/\/ikwilcirculairinkopen.nl\/app\/uploads\/sites\/2\/2022\/09\/Cruquius-bridge.png\",\"contentUrl\":\"https:\/\/ikwilcirculairinkopen.nl\/app\/uploads\/sites\/2\/2022\/09\/Cruquius-bridge.png\",\"width\":1215,\"height\":585,\"caption\":\"Cruquius bridge\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/ikwilcirculairinkopen.nl\/en\/cases\/cruquiusbrug-complex-projects-also-have-the-capacity-to-be-circular\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/ikwilcirculairinkopen.nl\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Cruquiusbrug \u2013 complex projects also have the capacity to be circular\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/ikwilcirculairinkopen.nl\/en\/#website\",\"url\":\"https:\/\/ikwilcirculairinkopen.nl\/en\/\",\"name\":\"Circular Procurement Platform\",\"description\":\"Aan de slag met circulair inkopen\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/ikwilcirculairinkopen.nl\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Circular Procurement Platform","description":"The two sections of the Cruquius Bridge are due for a facelift. The province of North Holland is focused on three pillars: circularity, energy neutrality and low maintenance.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ikwilcirculairinkopen.nl\/en\/cases\/cruquiusbrug-complex-projects-also-have-the-capacity-to-be-circular\/","og_locale":"en_US","og_type":"article","og_description":"The two sections of the Cruquius Bridge are due for a facelift. The province of North Holland is focused on three pillars: circularity, energy neutrality and low maintenance.","og_url":"https:\/\/ikwilcirculairinkopen.nl\/en\/cases\/cruquiusbrug-complex-projects-also-have-the-capacity-to-be-circular\/","og_site_name":"Circular Procurement Platform","article_modified_time":"2023-09-20T09:36:24+00:00","og_image":[{"width":1215,"height":585,"url":"https:\/\/ikwilcirculairinkopen.nl\/app\/uploads\/sites\/2\/2022\/09\/Cruquius-bridge.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/ikwilcirculairinkopen.nl\/en\/cases\/cruquiusbrug-complex-projects-also-have-the-capacity-to-be-circular\/","url":"https:\/\/ikwilcirculairinkopen.nl\/en\/cases\/cruquiusbrug-complex-projects-also-have-the-capacity-to-be-circular\/","name":"","isPartOf":{"@id":"https:\/\/ikwilcirculairinkopen.nl\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ikwilcirculairinkopen.nl\/en\/cases\/cruquiusbrug-complex-projects-also-have-the-capacity-to-be-circular\/#primaryimage"},"image":{"@id":"https:\/\/ikwilcirculairinkopen.nl\/en\/cases\/cruquiusbrug-complex-projects-also-have-the-capacity-to-be-circular\/#primaryimage"},"thumbnailUrl":"https:\/\/ikwilcirculairinkopen.nl\/app\/uploads\/sites\/2\/2022\/09\/Cruquius-bridge.png","datePublished":"2022-09-21T08:34:08+00:00","dateModified":"2023-09-20T09:36:24+00:00","description":"The two sections of the Cruquius Bridge are due for a facelift. The province of North Holland is focused on three pillars: circularity, energy neutrality and low maintenance.","breadcrumb":{"@id":"https:\/\/ikwilcirculairinkopen.nl\/en\/cases\/cruquiusbrug-complex-projects-also-have-the-capacity-to-be-circular\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ikwilcirculairinkopen.nl\/en\/cases\/cruquiusbrug-complex-projects-also-have-the-capacity-to-be-circular\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ikwilcirculairinkopen.nl\/en\/cases\/cruquiusbrug-complex-projects-also-have-the-capacity-to-be-circular\/#primaryimage","url":"https:\/\/ikwilcirculairinkopen.nl\/app\/uploads\/sites\/2\/2022\/09\/Cruquius-bridge.png","contentUrl":"https:\/\/ikwilcirculairinkopen.nl\/app\/uploads\/sites\/2\/2022\/09\/Cruquius-bridge.png","width":1215,"height":585,"caption":"Cruquius bridge"},{"@type":"BreadcrumbList","@id":"https:\/\/ikwilcirculairinkopen.nl\/en\/cases\/cruquiusbrug-complex-projects-also-have-the-capacity-to-be-circular\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/ikwilcirculairinkopen.nl\/en\/"},{"@type":"ListItem","position":2,"name":"Cruquiusbrug \u2013 complex projects also have the capacity to be circular"}]},{"@type":"WebSite","@id":"https:\/\/ikwilcirculairinkopen.nl\/en\/#website","url":"https:\/\/ikwilcirculairinkopen.nl\/en\/","name":"Circular Procurement Platform","description":"Aan de slag met circulair inkopen","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ikwilcirculairinkopen.nl\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/ikwilcirculairinkopen.nl\/en\/wp-json\/wp\/v2\/posts\/1151","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ikwilcirculairinkopen.nl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ikwilcirculairinkopen.nl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ikwilcirculairinkopen.nl\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/ikwilcirculairinkopen.nl\/en\/wp-json\/wp\/v2\/comments?post=1151"}],"version-history":[{"count":2,"href":"https:\/\/ikwilcirculairinkopen.nl\/en\/wp-json\/wp\/v2\/posts\/1151\/revisions"}],"predecessor-version":[{"id":1680,"href":"https:\/\/ikwilcirculairinkopen.nl\/en\/wp-json\/wp\/v2\/posts\/1151\/revisions\/1680"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ikwilcirculairinkopen.nl\/en\/wp-json\/wp\/v2\/media\/1551"}],"wp:attachment":[{"href":"https:\/\/ikwilcirculairinkopen.nl\/en\/wp-json\/wp\/v2\/media?parent=1151"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ikwilcirculairinkopen.nl\/en\/wp-json\/wp\/v2\/categories?post=1151"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ikwilcirculairinkopen.nl\/en\/wp-json\/wp\/v2\/tags?post=1151"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}